Company Profile:
Sarda Energy & Minerals Ltd (Formerly Raipur Alloys & Steels Limited). is a major player in the field of manufacturing of Ferro Alloys, Steel billets & ingots and Sponge Iron backed with its own Power Plant and Coal, Iron ore and Manganese ore mines. This is a Public Limited Company which is listed in Bombay Stock Exchange. The Group had mainly two big companies viz. Raipur Alloys & Steel Ltd. and Chhattisgarh Electricity Co. Ltd. On 1st July 2007, CECL has merged with RASL, which has subsequently changed its name to 'Sarda Energy & Minerals Ltd.'. Our future projects are Integrated Steel Plant at Mandhar,Raipur, 1100 mega power project at Champa, Power Plant at Kollam,Raigarh and Coal Washery Plant at Karwahi,Raigarh(CG).Raipur Alloys & Steel Ltd. was incorporated in 1973. This is ISO 9001:2000 certified company. The Company was taken over by the present management in 1978-79 as a sick unit with a meager steel ingot making capacity of 18,000 MT per annum. The Company had continuously modernized & expanded its production facilities, bringing up the steel making capacity to 1,40,000 MT per annum. The Company went into backward integration in the year 1991 with installation of Sponge Iron Plant of 30,000 MT per annum capacity, which was further expanded in 1995 to 60,000 MT. Presently the plant produces 3,60,000 MT of sponge iron per annum with its Two 100 TPD Kiln and two 500 TPD Kiln. Chhattisgarh Electricity Co. Ltd.(CECL) commenced production in 2001. The company has an integrated state of the art Ferro Alloys plant with an installed capacity of 66,000 tonnes of Ferro alloys production annually backed with its own captive Thermal Power Plant of 50 MW. The company has five 9 MVA closed top submerged Arc Furnaces equipped with pan casting facility for slag and tramp free tapping, ensuring cleaner product.
Sarda Energy & Minerals Ltd (Formerly Raipur Alloys & Steels Limited). is a major player in the field of manufacturing of Ferro Alloys, Steel billets & ingots and Sponge Iron backed with its own Power Plant and Coal, Iron ore and Manganese ore mines. This is a Public Limited Company which is listed in Bombay Stock Exchange. The Group had mainly two big companies viz. Raipur Alloys & Steel Ltd. and Chhattisgarh Electricity Co. Ltd. On 1st July 2007, CECL has merged with RASL, which has subsequently changed its name to 'Sarda Energy & Minerals Ltd.'. Our future projects are Integrated Steel Plant at Mandhar,Raipur, 1100 mega power project at Champa, Power Plant at Kollam,Raigarh and Coal Washery Plant at Karwahi,Raigarh(CG).Raipur Alloys & Steel Ltd. was incorporated in 1973. This is ISO 9001:2000 certified company. The Company was taken over by the present management in 1978-79 as a sick unit with a meager steel ingot making capacity of 18,000 MT per annum. The Company had continuously modernized & expanded its production facilities, bringing up the steel making capacity to 1,40,000 MT per annum. The Company went into backward integration in the year 1991 with installation of Sponge Iron Plant of 30,000 MT per annum capacity, which was further expanded in 1995 to 60,000 MT. Presently the plant produces 3,60,000 MT of sponge iron per annum with its Two 100 TPD Kiln and two 500 TPD Kiln. Chhattisgarh Electricity Co. Ltd.(CECL) commenced production in 2001. The company has an integrated state of the art Ferro Alloys plant with an installed capacity of 66,000 tonnes of Ferro alloys production annually backed with its own captive Thermal Power Plant of 50 MW. The company has five 9 MVA closed top submerged Arc Furnaces equipped with pan casting facility for slag and tramp free tapping, ensuring cleaner product.
COMPANY POSTED GOOD RESULTS FOR LAST TWO QUARTERS SEE RESULTS
EXPECTING 35 EPS FOR FULL YEAR BUY FOR A TARGET OF 200 IN NEXT 6 MONTHS STOCK HAS LOW DOWN SIDE RISK IN LAST 6 MONTHS STOCK LOW WAS 112.00RS HIGH 145.00 ONLY .BOOK VALUE AT 225.00RS
I read your blog, its so nice and provide good knowledge for us. I really like it and thanks to write this wonderful post.
ReplyDelete